Installing Rudder Head
This entry was posted on 4/4/2007 8:54 AM and is filed under Building Components,Build the Vaka Hull.
Working in very small increments of time I have finally been able to get the rudder head installed on the vaka.

The rudder head is roughed in meaning that the pintals are installed which means I can now add the final laminations on both sides. The outside layers of the rudder head have cut outs for the pintals so the rudder blade has a flat surface to rotate against.
Also the gudgeons are installed which means I have finished the aft end of the vaka so the deck can be installed there.
The next major components to be made are the upper and lower leeboard guards. I have ordered some nice teak but it has not arrived yet. While I am waiting for the teak I will install the last carlins and deck beams in the center section of the vaka.