Building the Tridarka Raider
Chief builds hull #1 for the Everglades Challenge 2007
Welcome to
Tridarka Boat Works

Building the Vaka

Amas and Vaka in Final Prep

Print the article

This entry was posted on 6/13/2007 8:41 AM and is filed under Build the Vaka Hull,Build the Amas.

Both vaka and amas are finally done.  Well, not 100% done since I still need to paint and install deck hardware.  But I finally finished installing the aka mounts so the amas are ready for final prep and painting.  The aka mounts were installed on the vaka a couple weeks ago.

Yesterday I started sanding the hulls and should be able to finish that prep work today.  Painting will start Thursday I hope.  If all goes well I should start installing deck hardware the following Monday.  That's a big IF though.

 del.icio.us  Stumbleupon  Technorati  Digg 

 

What did you think of this article?




Trackbacks
Trackback specific URL for this entry
  • No trackbacks exist for this entry.
Comments
    • No comments exist for this entry.
Leave a comment

Submitted comments will be subject to moderation before being displayed.

 Enter the above security code (required)

 Name

 Email (will not be published)

 Website

Your comment is 0 characters limited to 3000 characters.