Building the Tridarka Raider
Chief builds hull #1 for the Everglades Challenge 2007
Welcome to
Tridarka Boat Works

Building the Vaka

Mast, Hiking Benches, and Tiller

Print the article

This entry was posted on 8/7/2007 4:18 PM and is filed under Rigging,Building Components.

I finished the mast by installing the lightning rod and masthead fittings.  I made another jig so I could sand down one side of the masthead fitting.



Then I installed the long lightning rod.


This lightning rod runs the length of the mast and ends at the base plug.


It also doubles as a defensive weapon against whales


This shows everything complete with the bail installed for the headsail block.  The lightning rod is held at the top by the pin and a bolt for the bail.  The rod runs thru some pipe insulation so it won't slap against the mast.  Note that the lower bolt is being cut off flat at the nut.

Then it was on to the hiking benches.


Here they are having some of the underside supports bonded on.


And this shows the tiller mock up being laminated at the same time.  This tiller is just a quick version to get the tiller rise the way I want it.  After the correct height has been determined, I'll make a nice laminated tiller.  This one will work in the mean time but it will look a bit funny.

 del.icio.us  Stumbleupon  Technorati  Digg 

 

What did you think of this article?




Trackbacks
Trackback specific URL for this entry
  • No trackbacks exist for this entry.
Comments

    Leave a comment

    Submitted comments will be subject to moderation before being displayed.

     Enter the above security code (required)

     Name

     Email (will not be published)

     Website

    Your comment is 0 characters limited to 3000 characters.